Q-2, r. 9.01 - Design code of a storm water management system eligible for a declaration of compliance

Full text
84. A minimum freeboard of 300 mm must separate the water level associated with a 100-year return period and the point where the dry retention system starts to overflow at its lowest point.
O.C. 871-2020, s. 84.
In force: 2020-12-31
84. A minimum freeboard of 300 mm must separate the water level associated with a 100-year return period and the point where the dry retention system starts to overflow at its lowest point.
O.C. 871-2020, s. 84.